1 pcs | $ 419 |
Antminer S19 Upgrade Water Cooling Kit is used for Antminer S19 95T water cooling plate. The heat dissipation efficiency of water cooling is higher than that of air cooling, and the temperature of the hash board will naturally be much lower. As the temperature decreases, the power consumption of the hash board will naturally decrease, which can effectively save power. After the miner is changed to water cooling, the high-speed fan is no longer needed, and 95% of the heat is taken away by the water cooling. The installation of a water-cooled row and a low-speed fan to dissipate heat greatly reduces noise. The temperature of the hash board is greatly reduced, and the life of the chip can also be extended. , so that the overall stability of the miner is higher.
Note: This water cooling kit can only be used on S19 95T miners; if the hash rate does not match, please consult the sales staff for details.
Product list:
Product name | Quantity |
Lian Li integrated universal water cooling radiator 4.5KW | 1 |
Antminer S19 95T water cooling plate | 1 set (6 pcs) |
Hash board thermal grease (4W) 110g | 1 |
ASIC Miner 2 in 1 fan simulator | 2 |
ASIC miner water cooling liquid shunt multi | 2 |
Main water pipe | 4m |
Clamps | 26 |
Product detail introduction:
1) Lian Li integrated universal water cooling radiator 4.5kw * 1
2) Antminer S19 95T water cooling plate *1 set of 6 sheets
3) HY234 Hash board thermal grease 110g 4.0W/mk * 1
4) ASIC Miner 2 in 1 fan simulator * 2
5) ASIC miner water cooling liquid shunt multi * 2
6) Water pipe* 4m
7) 26 clamps
Modification tutorial of Antminer S19 water cooling plate
How to assemble the water cooling plate of the Antminer S19 hash board correctly and quickly? Please follow the steps below to install, if you have any questions, please contact the sales manager.
1. Disassemble the miner rig and remove the fans at the air inlet and air outlet of the Antminer S19 miner;
2. Then take out the hash boards and clean the dust;
3. Remove the fixing nut on the heat sinks, remove the original heat sinks, and clean the thermal grease on the surface of the ASIC chip with circuit board cleaning solution and cleanroom wipers;
4. After cleaning, re-apply thermal grease evenly on the surface of each ASIC chip, and then install the water-cooling plate corresponding to the nut hole on the hash board and fix it with a nut;
5. After installing the water cooling plates on the hash boards, reinstall the hash boards back to the miner's chassis. Now only one side of the fan can be installed;
6. Use nuts to fix the hash board and install the fan speed simulator;
7. Install the water pipe, cut the length of the water pipe according to the actual situation, and install the spring clip to fix the water pipe;
8. To connect the water divider, add a spring clip before connecting and make it firm.
9. Connect the cooling water pump, and the length of the water pipe is intercepted according to the actual situation. It is also necessary to fix the water pipe clamp to ensure that there is no leakage.
10. Connect the external water cooling radiator fan.
11. Start adding coolant and stop when the water level in the water tank no longer drops.
OK, this is the installation steps of the water cooling plate.
Payment method:
How to determine product prices and shipping costs?When you are ready to buy one or more products. You can consult the sales Manager to get a sample of the proforma invoice. The category, product price, and freight are included. |
||
How to complete the payment?We have the following payment methods. You can tell our sales Manager which payment you prefer and complete it. After the customer service checks and confirms the payment is completed. Provide the proforma invoice. And we will prepare to ship. |
||
Cryptocurrency Payment |
||
Bitcoin - The payment method at the designated address is efficient and practical and can be used anywhere in the world. Wallet Address |
||
USDT - The payment method at the designated address is efficient and practical and can be used anywhere in the world. Wallet Address |
||
ETH - The payment method at the designated address is efficient and practical and can be used anywhere in the world. Wallet Address |
||
LTC - The payment method at the designated address is efficient and practical and can be used anywhere in the world. Wallet Address |
||
USDC - The payment method at the designated address is efficient and practical and can be used anywhere in the world. Wallet Address |
||
Bank Transfer |
||
Wire transfer - USD - SeaTree Card Number |
||
Wire transfer - USD, EUR, GBP, HKD, CNH, CAD, SGD, JPY, AUD, NZD Card Number |
||
JP MORGAN CHASE BANK, N.A. Card Number |
||
Wire transfer - USD - Zhou sicong Card Number |
||
人民币支付 - CNY payment Card Number |
||
Other payment methods |
||
Cooperation express: |
Q: When will we ship after payment?
A: In order to ensure that the products we ship are in good condition. Issued approximately 1-2 days after receiving your payment.
Q: What if the product is damaged during transportation?
A: We will use a more robust package when shipping to avoid damage to the goods, and we can purchase transportation insurance in advance to reduce the loss of in the transport. although this problem is not common.
Q: What payment methods do we support?
A: We support bank transfer, wire transfer, BTC, third-party guarantee and Paypal.
Q: What should I do if there is a problem after receiving the products?
A: We have established good relationships with maintenance departments in many countries/regions in the world. For example, Venezuela, Iran, etc. If you have any questions within 3 days after receiving the goods, you can apply for after-sales service on the "My Order" page.
Q: Which express we support?
A: We will choose the cheapest and fastest transportation method for you. And we support DHL, UPS, TNT, Fedex, BRE, and also have express delivery services, such as Russia, the United States, Kuwait, etc.